{"id":38762,"date":"2026-11-22T12:01:11","date_gmt":"2026-11-22T12:01:11","guid":{"rendered":"https:\/\/www.kavdo.com\/press-brake-installation-foundation-guide\/"},"modified":"2026-11-22T17:01:49","modified_gmt":"2026-11-22T17:01:49","slug":"press-brake-installation-foundation-guide","status":"publish","type":"post","link":"https:\/\/www.kavdo.com\/ar\/press-brake-installation-foundation-guide\/","title":{"rendered":"\u062f\u0644\u064a\u0644 \u062a\u0631\u0643\u064a\u0628 \u0627\u0644\u0645\u0643\u0628\u0633: \u0625\u0639\u062f\u0627\u062f \u0627\u0644\u0645\u0648\u0642\u0639\u060c \u0627\u0644\u062a\u0633\u0648\u064a\u0629 \u0648\u0627\u0644\u062a\u0643\u0644\u064a\u0641"},"content":{"rendered":"
\u0625\u062c\u0627\u0628\u0629 \u0642\u0635\u064a\u0631\u0629:<\/strong> before a press brake arrives, prepare a level, solid floor or foundation<\/strong> rated for the machine’s weight and point loads, an electrical supply<\/strong> that matches the machine (voltage, frequency, breaker size), enough space and crane or forklift capacity<\/strong> to unload and position it, and the correct hydraulic oil<\/strong>. On site: unload and position, level the machine (typically to about 0.02\u20130.05 mm\/m along the bed, per the manufacturer), connect power, fill oil, check rotation and run-in, calibrate axes and test-bend, then train operators. Small and medium press brakes usually stand on a good industrial floor; heavy and long machines need a dedicated reinforced-concrete foundation.<\/p>\n\n
Foundation Requirements<\/h2>\n